PennDOT Announces Upcoming Work

Ridgway/Cyclone Pa. (May 13, 2011) PENNDOT Elk/McKean County Maintenance
Has announced work for the week of May 16, 2011 through May 20, 2011
Maintenance work planned by Elk County employees includes:

TURF CUTTING –SR 555, Medix Run

CRACK SEALING- 4001, Evergreen-4002, Grant Road.

SIGN REPAIR- Various Routes, County wide

BRIDGE REPAIRS- SR 948, Clarion River Bridge in Ridgway

DITCH CLEANING- 4009, Lamont

PIPE REPAIRS – 2003, Toby

Maintenance work planned by McKean County employees includes:

SIGN MAINTENANCE – Various Routes, County wide

BRIDGE CONSTRUCTION – SR 1017, Sweitzer Drive / SR 155, Annin Creek in Turtlepoint

SHOULDER REHABILITATION – SR 2001, Clement Road

CRACK SEALING – 4001, Big Shanty – 770, Minard Run

SIDE DOZE- SR 6 / 155, Port Allegany Area

SWEEPING-INTERSECTION / WHITE LINES – Various Routes, County wide

PATCHING- Various Routes, County wide

PATCHING- RT 0006, Kane area

CRACK SEALING / PATCHING- SR 0770, Bradford

BRUSHING – Various Bridges, County wide

SR-0120/816 Ridgway Area (May 16, 2011-May 20, 2011) Glenn O. Hawbakers, Inc.

This project involves drainage upgrades, tree trimming, guide rail replacement, and roadway milling and resurfacing from Ridgway to 3.8 miles east, toward St. Marys.

The contractor is scheduled to begin concrete roadway repairs on the east (Ridgway) end of the project. Concrete deflection testing will be performed on the milled section of the roadway to determine repair locations on the west end of the project. Drivers will encounter milled and rough road surfaces. Work zone speed limit will be reduced in milled areas. Traffic will be controlled by flaggers and there may be multiple daylight set-ups through the project. Drivers will experience delays as traffic takes turns moving through the work zone.
PENNDOT advises drivers to obey posted speed limits and remain alert, patient and cautious through the work zone.

Work to be performed Monday through Friday during daylight hours and all operations and schedules are weather dependent.

Route 1017 sec A01 / Otto Township / McKean Co. (May 15, 2011-May 21, 2011) Dolamite Products Co. Inc. (A.L. Blades & Sons Inc.) KNAPP CREEK BRIDGE

This contractor will be working under road closed conditions with a detour in place. No changes in traffic will be caused by the construction operations scheduled for next week.

The contractor will be forming and placing concrete for abutment 1 wings, and forming abutment 2 next week.

SR 155 /A 03 West of Port Allegany (May 16 2011-May 20, 2011) L.C. Whitford Company, Inc.

The contractor will start temporary road and stone excavation, and begin sheet piling for the bridge.

SR / Various locations (May 16, 2011 – May 20, 2011) IA Construction

IA Construction has scheduled the following work for next week. Complete the milling on SR 120 in St. Marys (Brusselles Street). In Johnsonburg the paving of SR 4007 will also be completed.

General cleanup of milled areas in the Johnsonburg area.

Drive with caution through the work zones and allow a few extra minutes when traveling.

All work weather permitting.

Motorists can visit the PENNDOT website at www.dot.state.pa.us and by clicking on the Statewide
Construction Map for updates concerning ongoing projects.

Citizens who want to report road concerns can call PENNDOT Maintenance at 1-800-FIX-ROAD (1-800-349-7623).

Comments

Popular posts from this blog

Arrests in Operation Diamond Drop

Woman Charged with Posting
Nude Picture on Facebook

Two Arrested on Drug Charges