Sullivan Road Bridge Temporarily Closed

PennDOT closed a bridge near Bradford on Wednesday and a short detour is in place.

The bridge spans Bennett Brook just northwest Sullivan Road. The detour uses Route Interstate Parkway and is less than a mile long.

On Monday, June 25, PennDOT McKean County Maintenance will begin work to repair the steel beams of the bridge. Repairs are expected to be finished July 6, weather permitting.

The decision to close the bridge was the result of a recent inspection. The Bennett Brook Bridge was built in 1940, is 31 feet long and carries an average of 420 vehicles per day.

PennDOT reminds motorists to follow detour signs, obey speed limits and always buckle up.

Follow PennDOT on Twitter at www.twitter.com/511PAStateCOLL.

The news leader of the Twin Tiers ...
since 1947

Comments

Popular posts from this blog

Arrests in Operation Diamond Drop

Two Arrested on Drug Charges

Cops: Man Had Sex with 13-Year-Old