Port Allegany Bridge Work Goes On

Work is continuing on the Route 155 bridge in Port Allegany just beyond the US Route 6 intersection.

Work includes deck repair, guiderail updates, back wall repair, painting, new expansion dams and erosion/sedimentation measures.

The repair work is being done during daylight hours, with flaggers in place at each end of the bridge to alternate traffic. Both lanes will be open at the end of each workday.

The $1.3 million project will be finished by October.

Comments

Popular posts from this blog

Arrests in Operation Diamond Drop

Two Arrested on Drug Charges

Cops: Man Had Sex with 13-Year-Old